Home?Import Representation? Case Study of German Handheld Terminal Import Customs Clearance: Secrets of 15-Day Fast Clearance at Nansha Port
I. Project Background: Emergency Order Meets Strict Supervision
In March 2023, we received an urgent commission from a security equipment manufacturer—requiring the import customs clearance of a batch of German-made professional handheld terminals within 30 days. These devices worth approximately 1.2 million euros were for a key infrastructure project in the Greater Bay Area, with tight deadlines, high requirements, and three special challenges:
The products involved radio transmission equipment requiring model approval from the Ministry of Industry and Information Technology
Nansha Customs had recently increased the inspection rate for electromechanical products to 30%
The client required nationwide delivery to 5 cities within 7 days after arrival
II. Three Key Points in Customs Clearance Plan Design
Based on 15 years ofImport Representation經(jīng)驗(yàn),我們團(tuán)隊(duì)在48小時(shí)內(nèi)制定了”三提前”通關(guān)策略:
1. 單證預(yù)審的”黃金72小時(shí)”
Completed compliance review of all declaration materials before the goods departed, specifically addressing differences between German CE certification and domestic radio management requirements. We:
Translated equipment technical parameters into Chinese manuals in advance
Coordinated with third-party testing agencies to pre-issue conformity declarations
Prepared complete equipment frequency usage documentation
2. Precise Calculation of Logistics Routes
Choosing Nansha Dongfa Terminal over traditional clearance ports was mainly based on:
Comparison items
Nansha Dongfa Terminal
Other Ports
Customs Clearance Efficiency for Electromechanical Products
1.5 days faster on average
Standard time - limit
Inspection Rate for Special Items
15% lower
Conventional Level
Greater Bay Area Distribution Costs
20% savings
Normal Rates
3. 應(yīng)急預(yù)案的”雙保險(xiǎn)”機(jī)制
For potential inspection delays, we prepared two solutions: