Shanghai Zhongshen International Trade Co., Ltd. - Two decades of trade agency expertise.
Service Hotline: 139 1787 2118
How long will it take for the release of machinery and equipment exported to Southeast Asia after customs inspection? 3 key factors
Category: Trade EssentialsDate: Southeast Asia, as one of the fastest - growing markets for Chinese machinery, saw its trade volume exceed $28 billion in 2022 (Data source: General Administration of Customs of China). However, differences in customs inspection policies among countries such as Indonesia, Vietnam, and Thailand often lead to cargo detention, directly affecting enterprises capital turnover and customer contract performance.
Home?Trade Essentials? How long will it take for the release of machinery and equipment exported to Southeast Asia after customs inspection? 3 key factors
I. Standard Release Cycles after Customs Inspection (Country - by - Country Comparison)Equipment ExportII. 3 Core Variables Affecting Release Timeliness
III. Practical Solutions to Shorten Release Time
Electromechanical products need to provide an additional SNI certification (Indonesian national standard)Since 2023, a 10 - digit HS code breakdown system has been implemented. Declaration errors will trigger a second inspection
Hai Phong Port, Vietnam
: Shortened to 1 - 3 working days under the customs clearance efficiency improvement project
Motors with a power exceeding 75kW need to apply for an energy efficiency certificateLaem Chabang Port, Thailand
Mechanical and electrical product test reports must be uploaded in advance to the VNACCS/VCIS system
: Routine inspection takes 2 - 5 working days
Pay special attention that motor - type equipment requires the submission of TISI certificationCustoms valuation disputes are the main cause of delays (accounting for 42%)
Variable 1: Completeness of Documents
Leading to a 35% increase in cases of customs clearance delays in Indonesia
IV. Emergency Plan for Delay Handling
Vietnamese customs require that the technical parameter table of mechanical equipment must include Chinese - English - Vietnamese language對(duì)照
It is recommended to use the ASEAN - wide electromechanical product classification database (ASEAN HS Explorer)
Variable 3: Customs Risk Rating
Incorrect first 6 digits of HS Code will trigger 100% container inspection
The Royal Malaysian Customs (JKDM) implements enterprise credit classification management
The inspection rate of AEO - certified enterprises is reduced to less than 5%
Application of the Pre - declaration System (PCS)
Thailand and the Philippines have made it mandatory to submit electronic manifests 24 hours before container loading
Jakarta Port, Indonesia
It is recommended to use an intelligent classification tool to pre - review the HS code (with an accuracy rate of up to 98.6%)
Standardization of Compliance Document Packages
Must include: ? Material test report issued by a third - party institution (including RoHS directive compliance statement) ? Equipment installation instructions (safety warning signs should be reflected) ? Original factory authorized distribution certificate (to deal with the widespread intellectual property inspections in Southeast Asia)
The inspection exemption rate for AEO - mutual - recognized enterprises between China and Malaysia, and China and Thailand has increased to 82%
Key Construction: ?
AEO certification implementation path
Traceability system (3 - year complete logistics records need to be retained) ? Compliance management internal audit mechanism (update the customs regulations database quarterly)
When there is an overdue detention (taking the Philippines as an example): import and exportSubmit a “Customs Inspection Objection Application” within 72 hours (accompanied by a review report from a testing agency)
: The average inspection time for machinery products is 3 - 7 working days
Activate the customs bond system (Bonded Warehouse) to avoid the accumulation of port detention fees
Launch the “Fast - track Processing Channel” through the local chamber of commerce (67 successful cases at Manila Port in 2023)
In 2024, the demand for machinery in Southeast Asia is expected to increase by 11%. By establishing a country - specific customs clearance database and implementing a dynamic compliance monitoring system, enterprises can shorten the average release time to 2.4 working days. It is recommended that exporters participate in the target countrys customs policy online seminars quarterly to continuously optimize supply chain resilience.
Launch the Fast - track Processing Channel through the local chamber of commerce (There were 67 successful cases at the Port of Manila in 2023)